Dilution washer operation

At initialization, the DWUD moves to the up position. If it is already up, it is lowered, then raised.

During each 2-second cycle on the DTT, the 10 nozzles operate as follows:

Nozzle 1

Nozzle 2

Nozzle 3

Nozzle 4

Nozzle 5

Nozzle 6

Nozzle 7

Nozzle 8

Nozzle 9

Nozzle 10

Detail of washer nozzles

If an assay is not running, you can operate the unit manually from the Manual Operation window.