When initialized, the WUD moves to the up position. If it is already up, it is lowered, then raised.
To advance the cuvettes to the next wash nozzle, the RRV rotates a full-turn.
During each rotation (2-second cycle), the nozzles operate as follows:
|
If an assay is not running, you can operate the unit manually from the Manual Operation window.