ISE Operation: manual operation

Use the Manual Operation panel in the lower left part of the ISE Operation window to check the function of individual ISE components and to perform maintenance.

Running a unit operation

  1. At the Menu Panel, select Maint., then select ISE Operation.

  2. At the Manual Operation panel, you can perform these operations:

Double-select

 

In the popup window

DPB

To move or initialize the drain buffer pump

In the DPB window, select Toggle to move and Init. to initialize.

BPEV

To turn the buffer solenoid valve off/on

 

DPEV

To turn the drain pump off/on/

 

MIXER

To turn the mixer off/on

 

R.T.MIX

To turn the room temperature thermostatic tank mixer off/on

 

  1. To check the potential of Na, K, Cl, Th1, and Th2 electrodes do the following:

  1. Select AD execute.

  2. When prompted, select Yes.

When the unit is operating even while the operating mode is WAIT, "Unit running" appears in the display area. The periodic wash mode is automatically set to Off.

Note

While "Unit running" is displayed, you can only perform other unit operations or the Initialize operation. (To perform another unit operation, first close windows opened for the current operation.)

  1. Once the operation completes, perform an Exit Initialize operation to normalize the ISE and to set periodic wash mode to On.